summaryrefslogtreecommitdiff
path: root/apt-pkg/acquire.cc
diff options
context:
space:
mode:
Diffstat (limited to 'apt-pkg/acquire.cc')
-rw-r--r--apt-pkg/acquire.cc6
1 files changed, 3 insertions, 3 deletions
diff --git a/apt-pkg/acquire.cc b/apt-pkg/acquire.cc
index a8a5abd34..120e809e1 100644
--- a/apt-pkg/acquire.cc
+++ b/apt-pkg/acquire.cc
@@ -5,9 +5,9 @@
Acquire - File Acquiration
- The core element for the schedual system is the concept of a named
+ The core element for the schedule system is the concept of a named
queue. Each queue is unique and each queue has a name derived from the
- URI. The degree of paralization can be controled by how the queue
+ URI. The degree of paralization can be controlled by how the queue
name is derived from the URI.
##################################################################### */
@@ -175,7 +175,7 @@ void pkgAcquire::Add(Worker *Work)
// ---------------------------------------------------------------------
/* A worker has died. This can not be done while the select loop is running
as it would require that RunFds could handling a changing list state and
- it cant.. */
+ it can't.. */
void pkgAcquire::Remove(Worker *Work)
{
if (Running == true)